Hy-Tec Industries Pty Ltd - Maxi Concrete Contract
Determination
INDUSTRIAL RELATIONS
COMMISSION OF NEW SOUTH WALES
Application by Hy-Tec Industries Pty Ltd.
(Case No. 10206 of 2023)
Before Commissioner Sloan
|
20 February 2023
|
VARIATION
1. Delete
subclause 2, Hy-Tec to Pay Current Rates, Surcharges and Fees, of Schedule 1 -
Rates, Surcharges and Fees, of the award published 19 November 2021 (390 I.G.
1190), and insert in lieu thereof the following:
2. Hy-Tec to Pay
Current Rates, Surcharges and Fees
2.1 Subject to
subclause 2.4 of this Schedule, Hy-Tec will:
(a) pay to the
Contract Carriers the out of hours surcharges set out in the table at subclause 2.3 below;
(b) continue to pay
to the Contract Carriers all other:
(i) Rates;
(ii) surcharges
(except for any out of hours surcharges); and
(iii) fees, on the
basis they were paid to the Contract Carriers as at the date this Contract
Determination was made; and
(c) continue to
apply the periodic rise and fall formula on the basis it was applied to all
Rates, Surcharges and Fees from the date this Contract Determination is varied.
2.2
(a) Despite
subclause 2.1(c), the cost and rate model used to derive utilisation based
cartage rates shall operate with a lower threshold of 5500m3 and an upper
threshold of 9500m3.
(b) Leave reserved
is granted to the parties to apply as they see fit in regard to the cost and
rate model used to derive the utilisation based cartage rates.
2.3 Table of Out of
Hours Surcharges
6 Wheeler
|
Surcharge
|
Application
|
Amount
|
Surcharge 1
|
Monday to Friday after 5.00am and up to and
|
$9.53 per m3 (min 3.0 m3)
|
|
including 6.00am
|
|
|
|
|
|
Monday to Friday from 5.00pm and before 7.00pm
|
|
Surcharge 2
|
Monday to Friday from 7.00pm and up to and
|
$15.24 per m3 (min 3.0 m3)
|
|
including 5.00am
|
|
|
|
|
|
Before 6.00am on a Saturday
|
|
Surcharge 3
|
Saturday 1.00pm to 5.00pm
|
$15.24 per m3 (min 3.0 m3)
|
Surcharge 4
|
Saturday after 5.00pm
|
$22.54 per m3
|
Surcharge 5
|
Sunday
|
$22.54 per m3
|
Surcharge 6
|
Public Holiday
|
$30.05 per m3
|
8 Wheeler
|
Surcharge
|
Application
|
Amount
|
Surcharge 1
|
Monday to Friday after 5.00am and up to and
|
$8.46 per m3 (min 3.6 m3)
|
|
including 6.00am
|
|
|
Monday to Friday from 5.00pm and before 7.00pm
|
|
Surcharge 2
|
Monday to Friday from 7.00pm and up to and
|
$13.55 per m3 (min 3.6 m3)
|
|
including 5.00am
|
|
|
Before 6.00am on a Saturday
|
|
Surcharge 3
|
Saturday 1.00pm to 5.00pm
|
$13.55 per m3 (min 3.6 m3)
|
Surcharge 4
|
Saturday after 5.00pm
|
$20.05 per m3
|
Surcharge 5
|
Sunday
|
$20.05 per m3
|
Surcharge 6
|
Public Holiday
|
$26.74 per m3
|
2.4 The Rates and/or
Surcharges and Fees and/or the rise and fall formula referred to in subclauses
2.1 and 2.3 of this Schedule may be changed subject to:
(a) agreement
between Hy-Tec and the Contract Carrier Executive; or
(b) variation of
this Contract Determination in accordance with the Industrial Relations Act
1996.
2. This variation
will take effect from the first full pay period commencing on or after 6
February 2023.
D. SLOAN, Commissioner