Metromix Pty Limited Maxi Concrete Cartage Contract
Determination
INDUSTRIAL RELATIONS
COMMISSION OF NEW SOUTH WALES
Application by Metromix Pty Ltd.
(Case No. 110607 of 2021)
Before Commissioner Webster
|
2 November 2021
|
VARIATION
1. Insert after
subclause 4.14 of subclause 4, Surcharge, of the Arrangement, of the contract
determination published 22 June 2018 (383 I.G. 185), the following new
subclause:
4.15 Early Load
Time
2. Delete paragraph
(c) of subclause 4.11 of clause 4, Surcharges, and insert in lieu thereof the
following:
(c) To avoid any
doubt a Contract Carrier shall only be paid the call back surcharge if the
Contract Carrier has been released from performing Cartage Work on a day and
has left the Plant and is then called back to the Plant to recommence
performing Cartage Work outside of Metromix’s Normal
Trading Hours on that day.
3. Insert after
subclause 4.14 of clause 4, Surcharges, the following new subclause:
4.15 Early Load Time
(a) When a Contract
Carrier has been given a load time to commence performing Cartage Work on a
day, in accordance with clause 9.3, that is on or from 4.00am and before 5.00am
the Contract Carrier shall be paid a surcharge equivalent to a Call Back
surcharge. This surcharge shall be in addition to any surcharge arising from
subclause 4.10.
(b) When a Contract
Carrier has been given a load time to commence performing Cartage Work on a
day, in accordance with clause 9.3, that is on or from 5.00am and before 6.00am
and the Contract Carrier does not receive a load before 6.00am they shall be
paid a surcharge equivalent to a Call Back surcharge. To avoid any doubt:
(i) this
surcharge shall not be paid if the Contract Carrier receives a load (batched
time); and
(ii) if the Contract
Carrier receives a load (batched time), they shall receive any relevant
surcharge arising from clause 4.10.
(c) The surcharges
set out in this subclause 4.15 shall be varied when and by the percentage that other Surcharges are varied in accordance
with this Contract Determination.
4. Delete the
definition of "Night Shift" in clause 29, Dictionary, and insert in
lieu thereof the following:
Night Shift means a shift where a Contract Carrier is
rostered, in accordance with clause 9.3, to commence performing Cartage Work
after 6.00pm and before 4.00am. To avoid any doubt this does not include an
early load time (refer clause 4.15), a late finish outside of Metromix’s Normal Trading Hours or when a Contract Carrier
is called back in accordance with clause 4.11.
5. This
variation will take effect on and from 27 May 2021.
J. WEBSTER, Commissioner
____________________
Printed by
the authority of the Industrial Registrar.