State Crest
New South Wales Industrial Relations Commission
(Industrial Gazette)





spacer image spacer image

Transport Industry - Excavated Materials, Contract Determination
  
Date09/06/2019
Volume385
Part1
Page No.241
DescriptionVCD - Variation of Contract Determination
Publication No.C8916
CategoryAward
Award Code 680  
Date Posted09/06/2019

spacer image spacer image

spacer image Click to download*
spacer image

(680)

SERIAL C8916

 

Transport Industry - Excavated Materials, Contract Determination

 

INDUSTRIAL RELATIONS COMMISSION OF NEW SOUTH WALES

 

Application by Transport Workers' Union of New South Wales, Industrial Organisation of Employees.

 

(Case No. 32136 of 2019)

 

Before Commissioner Sloan

12 February 2019

 

VARIATION

 

1.         Delete the second paragraph of clause 21, Area, Incidence and Duration, and insert in lieu thereof the following Remuneration of the contract determination published 24 October 1997 (301 I.G. 1082), and insert in lieu thereof the following:

 

This determination rescinds and replaces the Transport Industry - Excavated Materials Contract Determination published 9 July 1986 (242 LG. 89), as varied. It shall commence on and from 1 March 2019. This determination shall remain in force thereafter for a period of three years.

 

2.         Delete Part B, Rates of Remuneration, and Part C, Rise and Fall Formula, and insert in lieu thereof the following:

 

PART B

 

RATES OF REMUNERATION

 

 

2 Axles

3 Axles

4 Axles

5 Axles

6 Axles

6 Axles

7 Axles

PBS

Item

 

 

 

 

 

(48t)

 

T&D

 

($)

($)

($)

($)

($)

($)

($)

($)

1. Loading Rate

18.610

28.977

35.194

41.875

45.094

48.301

48.995

52.202

IA.Extra Capacity

 

 

 

 

 

 

 

 

(per cubic metre)

3.207

3.207

3.207

3.207

3.207

x

3.207

x

2. Kilometre Rate

 

 

 

 

 

 

 

 

(0-8 Km)

4.680

7.291

8.853

10.535

11.342

12.149

12.326

13.133

2A.Extra Capacity

 

 

 

 

 

 

 

 

(per cubic metre)

0.807

0.807

0.807

0.807

0.807

x

0.807

x

3. Kilometre Rate

 

 

 

 

 

 

 

 

(over 8 - 25 km)

4.330

6.744

8.194

9.747

10.500

11.247

11.408

12.155

3A.Extra Capacity

 

 

 

 

 

 

 

 

(per cubic metre)

0.747

0.747

0.747

0.747

0.747

x

0.747

x

4. Kilometre Rate

 

 

 

 

 

 

 

 

(over 25 km)

3.406

3.406

3.406

3.406

3.406

4.100

3.406

4.100

4A.Extra Capacity

 

 

 

 

 

 

 

 

(per cubic metre)

0.694

0.694

0.694

0.694

0.694

x

0.694

x

6. Hourly Rate

61.016

95.009

115.434

137.239

147.800

158.354

168.175

178.729

6A.Extra Capacity

 

 

 

 

 

 

 

 

(per cubic metre)

10.554

10.554

10.554

10.554

10.554

x

10.554

x

 

PART C

 

Rise and Fall Formula

 

1.         The rates prescribed in Part B may be adjusted each year upon application to the Industrial Relations Commission of New South Wales.

 

2.         Application for adjustment shall be made by reference to the weighted movement in the following benchmarks for each cost component, calculated as at the end of the full quarter immediately preceding the variation, with each adjustment application based upon the rates and amounts in the immediately preceding variation.

 

Component

Benchmark

Current

Weighting

Current

 

Index

 

Wages

Road Transport and Distribution Award 20I 0, Grade Three

790.50

34.89

 

Transport Worker

 

 

Capital

ABS Consumer Price Index (CPI), Motor Vehicles, Australia

91.6

18.17

Insurances

ABS CPI, Insurance, Australia

130.1

5.95

Registration

ABS CPI, Transpo1iation Group, Other Services in respect

130.4

3.49

 

of motor vehicles.

 

 

Repairs &

ABS CPI, Transportation Group, Maintenance and Repair

110.8

17.64

Maintenance

of Motor and Repair of motor vehicles

 

 

 

ABS CPI, Transpo1iation Group, Spare Parts and

 

4.74

Tyres

Accessories for motor vehicles

109.3

 

Fuel AIPNSW

Average for the Retail Price of diesel (excluding GST),

 

 

State

calculated by determining the average of the weekly figures

129.25

11.66

 

between the end of the quarter relating to the last variation

 

 

 

and the end of the quarter prior to any new variation.

 

 

Administration

ABS CPI, All Groups, Sydney

114.7

3.46

Total

 

 

100.00

 

3.         If the cost components, excepting fuel, change such that it causes an increase in the total remuneration of 2 percent or more from the date of the last variation, an interim adjustment may be made. An application to vary rates of remuneration for changes in the price of fuel may be made at any time, provided that the date upon which any rate adjustment is sought to become operative is at least one calendar month after the last occasion upon which a fuel rate adjustment became operative.

 

4.         Each cost component will be re-weighed after each adjustment.

 

5.         Parties to this Determination will confer with a view to reaching agreement on any application for adjustment on any application for adjustment. In the absence of agreement the rates and amounts shall be dete1mined by the IRC.

 

6.         Notwithstanding anything contained in this Part, a variation shall not be retrospective in operation but shall operate from a date not earlier than the date upon which it is made.

 

3.         This variation shall take effect on and from 1 March 2019.

 

 

 

D. SLOAN, Commissioner

 

 

____________________

 

 

Printed by the authority of the Industrial Registrar.

* to download attachment
  
IE UsersRight click the attachment - Click 'Save Target As' - Select a location - Click 'Save'
Netscape UsersRight click the attachment - Select 'Save Link As' - Select a location - Click 'Save'