Transport
Industry - Quarried Materials, &c., Carriers Contract Determination
INDUSTRIAL RELATIONS
COMMISSION OF NEW SOUTH WALES
Correction to Serial
C7639 published 9 September 2011
(371 I.G. 867)
(No. IRC 813 of 2011)
CORRECTION
For instruction 2, substitute the following new instruction:
2. Delete Schedule
1: Quantity/Distance and Hourly Hire Rates, of Annexure "A", Cartage
Rates, and insert in lieu thereof the following:
SCHEDULE 1
QUANTITY/DISTANCE AND HOURLY HIRE RATES
Quantity/ Distance
+ Hourly 2009/10
Symbol
|
Item
|
Rate
|
Unit
|
|
|
$
|
|
F.F
|
Flag Fall
|
3.820
|
Per Tonne
|
A
|
|
0.225
|
Per Tonne
|
B
|
|
0.205
|
Per Tonne
|
C
|
|
0.194
|
Per Tonne
|
D
|
|
0.173
|
Per Tonne
|
E
|
|
1.640
|
Per Tonne
|
F
|
|
0.154
|
Per Tonne
|
G
|
|
0.146
|
Per Tonne
|
H
|
Large Material
|
1.150
|
Per Tonne
|
I
|
Large Material 600+ material
|
1.944
|
Per Tonne
|
Quantity/Distance
+ Hourly 2011
Symbol
|
Item
|
Rate
|
Unit
|
|
|
$
|
|
F.F
|
Flag Fall
|
3.988
|
Per Tonne
|
A
|
|
0.235
|
Per Tonne
|
B
|
|
0.214
|
Per Tonne
|
C
|
|
0.203
|
Per Tonne
|
D
|
|
0.181
|
Per Tonne
|
E
|
|
0.171
|
Per Tonne
|
F
|
|
0.161
|
Per Tonne
|
G
|
|
0.152
|
Per Tonne
|
H
|
Large Material
|
1.201
|
Per Tonne
|
I
|
Large Material 600+ material
|
2.029
|
Per Tonne
|
External Hourly
Rates 2009/10
J
|
2 Axle Vehicle
|
52.65
|
Per Hour
|
K
|
3 Axle Vehicle
|
63.34
|
Per Hour
|
L
|
4 Axle Vehicle
|
73.46
|
Per Hour
|
M
|
5 Axle Vehicle
|
94.65
|
Per Hour
|
N
|
6 Axle Vehicle
|
100.11
|
Per Hour
|
External Hourly
Rates 2011
J
|
2 Axle Vehicle
|
54.96
|
Per Hour
|
K
|
3 Axle Vehicle
|
66.12
|
Per Hour
|
L
|
4 Axle Vehicle
|
76.69
|
Per Hour
|
M
|
5 Axle Vehicle
|
98.81
|
Per Hour
|
N
|
6 Axle Vehicle
|
104.51
|
Per Hour
|
Internal Hourly
Rates 2009/10
O
|
2 Axle Vehicle
|
69.63
|
Per Hour
|
P
|
3 Axle Vehicle
|
72.86
|
Per Hour
|
Q
|
4 Axle Vehicle
|
84.48
|
Per Hour
|
R
|
5 Axle Vehicle
|
108.88
|
Per Hour
|
S
|
6 Axle Vehicle
|
113.58
|
Per Hour
|
Internal Hourly
Rates 2011
O
|
2 Axle Vehicle
|
72.69
|
Per Hour
|
P
|
3 Axle Vehicle
|
76.06
|
Per Hour
|
Q
|
4 Axle Vehicle
|
88.19
|
Per Hour
|
R
|
5 Axle Vehicle
|
113.66
|
Per Hour
|
S
|
6 Axle Vehicle
|
118.57
|
Per Hour
|
G.
M. GRIMSON Industrial
Registrar.
____________________
Printed by
the authority of the Industrial Registrar.