Transport
Industry - Car Carriers (NSW) Contract Determination
INDUSTRIAL RELATIONS
COMMISSION OF NEW SOUTH WALES
Application by Transport
Workers' Union of New South Wales, Industrial Organisation of Employees.
(No. IRC 1475 of 2010)
Before Commissioner
Macdonald
|
15 February 2011
|
VARIATION
1. Delete
paragraph (a) of subclause (i) of clause 7, Other Conditions, of the award
published 11 July 2008 (366 I.G. 274) and insert in lieu thereof the following:
(i) The
remuneration of a Contract Carrier shall be subject to adjustment under this
subclause.
(a) The Principal
Contractor may (subject to notice of two weeks) deduct the sum of $264.92 for
each incident involving a car or cars under the care or control of the Contract
Carrier being damaged and the sum of $264.92 for each car from which an item
becomes missing while the car is under the care or control of the Contract
Carrier and the sum of $264.92 for each car which has damage or from which an
item is missing (being damage of the kind referred to in Clause 5(i)(i) which
is not noted on the initial survey). In the event that repair and/or
replacement costs are less than $264.92, the lesser amount shall be paid by the
Contract Carrier. The amount in this clause ($264.92) shall be varied at the
same percentage as the rate adjustment applicable within this determination.
2. Delete
subclause (vii) of clause 8 Conditions, and insert in lieu thereof the
following:
(vii) The Principal
Contractor may adjust the remuneration of the Contract Carrier by way of
deducting any amount properly payable by the Contract Carrier which has been
incurred by the Contract Carrier in the name of the Principal Contractor; and
the Principal Contractor may withhold payment from the Contract Carrier’s
remuneration of the amount of $317.89 for a maximum of three months on the
Contract Carrier ceasing to undertake work for the Principal Contractor, to
enable the final adjustment to be made under this sub-clause. The Principal
Contractor shall pay the balance of the remuneration due to the Contract
Carrier not later than on the expiry of the period of three months. The $317.89
amount referred to in this clause shall be varied by an amount equal to the
overall percentage variation to rates of remuneration as provided by this
determination.
3. Delete Schedule
1 - Rates of Remuneration and insert in lieu thereof the following:
SCHEDULE 1 - RATES OF REMUNERATION
(i) This schedule
contains the following tables:
Table A: Rates of remuneration for local and interstate
work where the contract carrier supplies the prime mover only.
Table B: Rates of remuneration for local and intrastate
work where the contract carrier supplies both the prime mover and the trailer.
Table C: Rates of remuneration for local and intrastate
work where the contract carrier supplies the prime mover and the tyres for the
principal contractor's trailer.
Table D: Rates of remuneration for Port Kembla Work
(including the base rate of remuneration for Port Kembla Work - also referred
to as the "Connor Rate") where the contract carrier supplies the
prime mover only.
Table E: Rates of remuneration for Port Kembla Work
where the contract carrier supplies both the prime mover and trailer.
Table F: Rates of remuneration for Port Kembla Work
where the contract carrier supplies both the prime mover and the tyres for the
principal contractor’s trailer.
Table G: Deemed distances to apply for common trips
from the Sydney Metropolitan Area to towns within the State of New South Wales,
for the purpose of calculating intrastate remuneration.
Table H: Deemed distances to apply for common trips
originating and terminating in the Sydney Metropolitan Area and passing through
towns within the State of New South Wales, for the purposes of calculating
intrastate remuneration.
(ii) Where:
(a) a carrier
performs a contract of carriage within the area, incidence and duration of this
determination; and
(b) the carrier is
eligible to claim a rebate pursuant to the Commonwealth Government’s Tax Fuel
Credit Subsidy [‘the subsidy’] for that contract of carriage; and
(c) the carrier has
been requested to apply for the subsidy pursuant to the scheme by the principal
contractor;
the principal contractor may reduce the cartage rates
payable in Tables "A", "B", "C", "D",
"E" and "F" of Schedule I of this determination up to a
maximum reduction of 1.74% of the rate otherwise payable to the carrier for the
performance of that contract of carriage.
(iii) Should a
carrier become ineligible to claim a rebate pursuant to the subsidy or should
the subsidy be abolished then the principal contractor shall not be permitted
to reduce the cartage rates pursuant to subclause (ii).
(iv) Should the subsidy
be abolished or altered or modified leave is reserved to the parties to make
application in relation to subclauses (ii) and (iii).
(v) Whenever a rates
contained in schedule 1 to this determination are altered the maximum reduction
referred to in subclause (ii) of this schedule shall be calculated according to
the following formula:
(a) (fuel per litre,
less GST- fuel tax credit per litre)/ fuel per litre, less GST) x 100 = (a)
(b) new weighting
for fuel x (a) = (b)
(c) reset weighting
for fuel - (b) = maximum reduction
For the purpose of this formula the cost of fuel per
litre shall be based on that benchmark adopted under schedule 2 of the
Determination.
(vi) Currently, the
maximum reduction contained in subclause (ii) is calculated according to the
following formula:
(d) (116.77 -
15.543)/ 16.77) x 100 = (86.67)
(e) 16.05 x (86.67%)
= (13.91)
(f) 15.65 - (13.91)
= 1.74%
(vii) The rates
contained within this schedule shall take effect on and from the first full pay
period to commence on or after 23 March 2011.
Car Carriers
Contract Determination Rate Adjustment
|
March 2011
|
Percentage
variation = 2.56%
|
Category
|
Old
|
New
|
%
|
Current
|
New
|
Reset
|
|
Value
|
Value
|
Change
|
Weighting
|
Weighting
|
Weighting
|
|
|
|
|
|
|
|
Wages
|
$656.70
|
$675.10
|
2.80%
|
4199
|
43.17
|
42.09
|
Capital
|
97.9
|
97.1
|
-0.82%
|
17.17
|
17.03
|
16.60
|
Insurances
|
316
|
329.5
|
4.27%
|
10.74
|
11.20
|
10.92
|
Registration
|
246.5
|
260.7
|
5.76%
|
4.57
|
4.83
|
4.71
|
R&M
|
166
|
169.4
|
2.05%
|
6.46
|
6.59
|
6.43
|
Tyres
|
143.2
|
142.5
|
-0.49%
|
1.30
|
1.29
|
1.26
|
Fuel
|
112.33
|
116.773
|
3.96%
|
15.44
|
16.05
|
15.65
|
Admin
|
168.1
|
172.5
|
2.62%
|
2.33
|
2.39
|
2.33
|
|
|
|
|
100.00
|
102.56
|
100.00
|
4. Delete Tables
"A", "B", "C", "D", "E" and
"F" of Schedule 1 and insert in lieu thereof the following:
Table A - (Including 2% Trailer Hire)
Local Work
|
Zone Rates per Car
Carriage - Prime Mover
|
Zone
|
1 Car
|
3 Car
|
4 Car
|
5 Car
|
6 Car
|
1 Car
|
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Tilt
|
|
$
|
$
|
$
|
$
|
$
|
$
|
1
|
31.79
|
50.37
|
66.58
|
82.57
|
91.20
|
37.16
|
2
|
48.02
|
74.88
|
94.37
|
114.31
|
125.10
|
56.15
|
3
|
61.55
|
94.55
|
116.61
|
141.75
|
154.90
|
71.94
|
4
|
72.35
|
111.23
|
138.70
|
169.24
|
184.56
|
84.61
|
5
|
80.47
|
133.83
|
160.86
|
196.68
|
214.37
|
94.07
|
Rates Per Car
Delivered
|
Zone
|
1 Car
|
3 Car
|
4 Car
|
5 Car
|
6 Car
|
1 Car
|
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Tilt
|
|
$
|
$
|
$
|
$
|
$
|
$
|
1
|
31.79
|
16.80
|
16.65
|
16.59
|
15.20
|
37.16
|
2
|
48.02
|
24.96
|
23.58
|
22.86
|
20.84
|
56.15
|
3
|
61.55
|
31.52
|
29.16
|
28.34
|
24.79
|
71.94
|
4
|
72.35
|
37.08
|
34.69
|
33.84
|
30.77
|
84.61
|
5
|
80.47
|
44.61
|
40.21
|
39.33
|
35.73
|
94.07
|
Vehicle
|
Standing and
Running
|
Standing Rate
|
|
Rate per Hour
|
per Hour
|
|
$
|
$
|
1 car
|
40.57
|
0.00
|
0.00
|
31.46
|
0.00
|
|
3 car
|
49.11
|
0.00
|
0.00
|
39.01
|
0.00
|
|
4 car
|
55.50
|
0.00
|
0.00
|
44.39
|
0.00
|
|
5 car
|
58.87
|
0.00
|
0.00
|
46.49
|
0.00
|
|
6 car
|
63.65
|
0.00
|
0.00
|
50.80
|
0.00
|
|
1 car tilt
|
47.42
|
0.00
|
0.00
|
36.33
|
0.00
|
|
Intrastate Work
|
|
Vehicle
|
Standing and
Running Rate cents per Km
|
|
|
|
|
1 Car
|
78.18
|
|
3 Car
|
111.98
|
|
4 Car
|
123.98
|
|
5 Car
|
137.55
|
|
6 car
|
147.87
|
|
1 car tilt
|
91.70
|
|
Table B - Local Work
Local Work
|
Zone Rates per Car
Carriage - Prime Mover & Trailer
|
Zone
|
1 Car
|
3 Car
|
4 Car
|
5 Car
|
6 Car
|
1 Car
|
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Tilt
|
|
$
|
$
|
$
|
$
|
$
|
$
|
1
|
33.08
|
56.42
|
75.39
|
95.41
|
104.55
|
40.27
|
2
|
49.98
|
83.95
|
106.68
|
131.69
|
145.27
|
60.85
|
3
|
64.06
|
106.00
|
131.79
|
163.19
|
179.89
|
77.98
|
4
|
75.29
|
127.94
|
156.90
|
194.91
|
214.37
|
91.73
|
5
|
83.76
|
150.00
|
181.97
|
226.47
|
248.92
|
101.98
|
Rates Per Car
Delivered
|
Zone
|
1 Car
|
3 Car
|
4 Car
|
5 Car
|
6 Car
|
1 Car
|
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Tilt
|
|
$
|
$
|
$
|
$
|
$
|
$
|
1
|
33.08
|
18.81
|
18.86
|
19.09
|
17.41
|
40.27
|
2
|
49.98
|
27.98
|
26.68
|
26.34
|
24.20
|
60.85
|
3
|
64.06
|
35.33
|
32.94
|
32.64
|
29.98
|
77.98
|
4
|
75.29
|
42.65
|
39.22
|
38.97
|
35.73
|
91.73
|
5
|
83.76
|
50.00
|
45.49
|
45.29
|
41.50
|
101.98
|
Vehicle
|
Standing and
Running
|
Standing Rate
|
Rate per Hour
|
per Hour
|
$
|
$
|
1 car
|
42.23
|
33.02
|
3 car
|
55.05
|
39.49
|
4 car
|
62.78
|
45.43
|
5 car
|
67.77
|
48.34
|
6 car
|
73.89
|
62.42
|
1 car tilt
|
51.40
|
39.79
|
Intrastate Work
|
Vehicle
|
Standing and Running Rate cents per Km
|
1 Car
|
76.86
|
3 Car
|
119.31
|
4 Car
|
132.48
|
5 Car
|
147.13
|
6 car
|
153.58
|
1 car tilt
|
94.64
|
Table C - (Including 2% Trailer Hire)
Local Work
|
Zone Rates per Car
Carriage - Prime Mover
|
Zone
|
1 Car
|
3 Car
|
4 Car
|
5 Car
|
6 Car
|
1 Car
|
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Tilt
|
|
$
|
$
|
$
|
$
|
$
|
$
|
1
|
32.15
|
50.97
|
68.07
|
84.28
|
92.76
|
37.14
|
2
|
48.59
|
75.82
|
96.45
|
116.23
|
127.25
|
56.09
|
3
|
62.31
|
95.73
|
119.13
|
143.48
|
157.42
|
71.90
|
4
|
73.25
|
115.61
|
141.82
|
172.03
|
187.60
|
84.54
|
5
|
81.45
|
135.51
|
164.51
|
200.02
|
217.79
|
94.04
|
Rates Per Car
Delivered
|
Zone
|
1 Car
|
3 Car
|
4 Car
|
5 Car
|
6 Car
|
1 Car
|
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Tilt
|
|
$
|
$
|
$
|
$
|
$
|
$
|
1
|
32.15
|
16.98
|
17.01
|
16.86
|
15.47
|
37.14
|
2
|
48.59
|
25.27
|
24.10
|
23.25
|
21.20
|
56.09
|
3
|
62.31
|
31.91
|
29.78
|
28.70
|
26.23
|
71.90
|
4
|
73.25
|
38.53
|
35.47
|
34.41
|
31.28
|
84.54
|
5
|
81.45
|
45.18
|
41.13
|
40.00
|
36.30
|
94.04
|
Vehicle
|
Standing and
Running
|
Standing Rate
|
|
Rate per Hour
|
per Hour
|
|
$
|
$
|
1 car
|
41.08
|
31.42
|
3 car
|
49.73
|
39.00
|
4 car
|
57.22
|
44.38
|
5 car
|
59.85
|
46.47
|
6 car
|
64.69
|
50.75
|
1 car tilt
|
47.41
|
36.30
|
Intrastate Work
|
Vehicle
|
Standing and
Running Rate cents per Km
|
1 Car
|
80.06
|
3 Car
|
115.13
|
4 Car
|
130.23
|
5 Car
|
142.88
|
6 car
|
153.73
|
1 car tilt
|
91.65
|
Table D - (Including 2% Trailer Hire)
Port Kembla
Local Work
|
Zone Rates per Car
Carriage - Prime Mover
|
Zone
|
1 Car
|
3 Car
|
4 Car
|
5 Car
|
6 Car
|
1 Car
|
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Tilt
|
|
$
|
$
|
$
|
$
|
$
|
$
|
Base rate
|
186.35
|
257.82
|
287.27
|
314.56
|
339.38
|
217.72
|
1
|
206.65
|
282.38
|
315.02
|
347.13
|
371.22
|
241.43
|
2
|
226.92
|
306.93
|
342.76
|
373.44
|
403.04
|
265.16
|
3
|
247.21
|
331.48
|
370.52
|
402.88
|
434.87
|
288.87
|
4
|
267.51
|
356.06
|
398.25
|
432.32
|
466.69
|
312.59
|
5
|
313.15
|
411.29
|
460.70
|
498.56
|
538.32
|
365.94
|
Rates Per Car
Delivered
|
Zone
|
1 Car
|
3 Car
|
4 Car
|
5 Car
|
6 Car
|
1 Car
|
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Tilt
|
|
$
|
$
|
$
|
$
|
$
|
$
|
Base rate
|
186.35
|
85.94
|
71.81
|
62.92
|
56.57
|
217.72
|
1
|
206.65
|
94.12
|
78.76
|
68.80
|
61.87
|
241.43
|
2
|
226.92
|
102.31
|
85.70
|
74.68
|
67.17
|
265.16
|
3
|
247.21
|
110.49
|
92.62
|
80.57
|
71.45
|
288.87
|
4
|
267.51
|
118.68
|
99.57
|
86.47
|
77.78
|
312.59
|
5
|
313.15
|
137.09
|
115.17
|
99.72
|
89.72
|
365.94
|
Vehicle
|
Standing and
Running
|
Standing Rate
|
|
Rate per Hour
|
per Hour
|
|
$
|
$
|
1 car
|
40.57
|
31.46
|
3 car
|
49.11
|
39.01
|
4 car
|
55.50
|
44.39
|
5 car
|
58.87
|
46.49
|
6 car
|
63.65
|
50.80
|
1 car tilt
|
47.42
|
36.33
|
Intrastate Work
|
Vehicle
|
Standing and
Running Rate per Km
|
|
$
|
1 Car
|
78.18
|
3 Car
|
111.98
|
4 Car
|
123.98
|
5 Car
|
137.55
|
6 car
|
147.87
|
1 car tilt
|
91.71
|
Table E
Port Kembla (Including 2% Trailer Hire)
Local Work
|
Zone Rates per Car
Carriage - Prime Mover
|
Zone
|
1 Car
|
3 Car
|
4 Car
|
5 Car
|
6 Car
|
1 Car
|
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Tilt
|
|
$
|
$
|
$
|
$
|
$
|
$
|
Base rate
|
186.35
|
271.58
|
303.56
|
334.42
|
357.63
|
228.20
|
1
|
207.47
|
299.12
|
335.37
|
368.30
|
394.57
|
253.90
|
2
|
228.59
|
326.65
|
366.74
|
402.18
|
431.53
|
295.97
|
3
|
249.69
|
354.17
|
398.14
|
436.06
|
468.48
|
305.31
|
4
|
270.79
|
381.70
|
429.52
|
469.95
|
505.43
|
331.00
|
5
|
318.31
|
443.65
|
500.15
|
546.19
|
588.57
|
388.85
|
Rates Per Car
Delivered
|
Zone
|
1 Car
|
3 Car
|
4 Car
|
5 Car
|
6 Car
|
1 Car
|
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Tilt
|
|
$
|
$
|
$
|
$
|
$
|
$
|
Base rate
|
186.35
|
90.52
|
76.00
|
66.89
|
59.61
|
228.20
|
1
|
207.47
|
99.71
|
83.83
|
73.67
|
65.76
|
253.90
|
2
|
228.59
|
108.89
|
91.69
|
80.44
|
71.92
|
295.97
|
3
|
249.69
|
118.06
|
99.53
|
87.21
|
78.07
|
305.31
|
4
|
270.79
|
127.24
|
107.39
|
94.00
|
84.24
|
331.00
|
5
|
318.31
|
147.89
|
125.05
|
109.24
|
98.10
|
388.85
|
Vehicle
|
Standing and
Running
|
Standing Rate
|
|
Rate per Hour
|
per Hour
|
|
$
|
$
|
1 car
|
42.23
|
33.02
|
3 car
|
55.05
|
39.49
|
4 car
|
62.78
|
45.43
|
5 car
|
67.77
|
48.34
|
6 car
|
73.89
|
56.17
|
1 car tilt
|
51.40
|
39.79
|
Intrastate Work
|
Vehicle
|
Standing and
Running Rate cents per Km
|
1 Car
|
76.86
|
3 Car
|
119.31
|
4 Car
|
132.48
|
5 Car
|
147.13
|
6 car
|
153.58
|
1 car tilt
|
94.64
|
Table F - (Including 2% Trailer Hire)
Port Kembla
Local Work
|
Zone Rates per Car
Carriage - Prime Mover
|
Zone
|
1 Car
|
3 Car
|
4 Car
|
5 Car
|
6 Car
|
1 Car
|
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Tilt
|
|
$
|
$
|
$
|
$
|
$
|
$
|
Base rate
|
189.63
|
263.44
|
298.39
|
324.02
|
349.78
|
217.57
|
1
|
210.17
|
288.29
|
326.75
|
353.96
|
382.13
|
246.13
|
2
|
230.71
|
313.16
|
355.11
|
383.87
|
414.48
|
277.80
|
3
|
251.24
|
338.03
|
383.48
|
413.81
|
446.82
|
288.71
|
4
|
271.77
|
362.89
|
411.85
|
443.75
|
479.43
|
312.42
|
5
|
317.97
|
418.83
|
475.68
|
511.08
|
551.98
|
365.77
|
Rates Per Car
Delivered
|
Zone
|
1 Car
|
3 Car
|
4 Car
|
5 Car
|
6 Car
|
1 Car
|
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Capacity
|
Tilt
|
|
$
|
$
|
$
|
$
|
$
|
$
|
Base rate
|
189.63
|
87.81
|
74.59
|
64.81
|
58.28
|
217.57
|
1
|
210.17
|
96.09
|
81.68
|
70.78
|
63.69
|
246.13
|
2
|
230.71
|
104.39
|
88.79
|
76.78
|
69.08
|
277.80
|
3
|
251.24
|
112.67
|
95.87
|
82.76
|
74.47
|
288.71
|
4
|
271.77
|
120.97
|
102.96
|
88.76
|
79.87
|
312.42
|
5
|
317.97
|
139.61
|
118.92
|
102.21
|
91.99
|
365.77
|
Vehicle
|
Standing and
Running
|
Standing Rate
|
|
Rate per Hour
|
per Hour
|
|
$
|
$
|
1 car
|
41.08
|
31.41
|
3 car
|
49.73
|
39.00
|
4 car
|
56.74
|
44.38
|
5 car
|
59.85
|
46.48
|
6 car
|
64.69
|
50.75
|
1 car tilt
|
47.41
|
36.30
|
Intrastate Work
|
Vehicle
|
Standing and Running Rate cents per Km
|
|
1 Car
|
80.06
|
|
3 Car
|
115.13
|
|
4 Car
|
130.23
|
|
5 Car
|
142.88
|
|
6 car
|
153.73
|
|
1 car tilt
|
91.65
|
|
5. Delete Schedule
2 - Procedure and Time for Adjustment of Rates and Amounts - Rates of
Remuneration and insert in lieu thereof the following:
Schedule 2
Procedure and Time
for Adjustment of Rates and Amounts
1. The rates
prescribed in Schedule 1 may be adjusted each year upon application to the
Industrial Relations Commission of New South Wales.
2. Applications for
adjustment shall be made by reference to the calculated weighted movements in
the following benchmarks for each cost component, calculated as at the end of
the September Quarter each year.
Component
|
Benchmark
|
Index
|
Index
|
|
|
|
Weighting
|
Wages
|
Transport Industry (State) Award, Grade Three
|
|
|
|
Transport Worker
|
$675.10
|
42.09
|
Capital
|
ABS Consumer Price Index (CPI), Transportation
|
|
|
|
Group, Motor Vehicles
|
97.1
|
16.60
|
Insurances
|
ABS CPI Financial and insurance services,
|
|
|
|
Insurance Services
|
329.5
|
10.92
|
Registration
|
ABS CPI, Transportation Group, Other Motoring
|
|
|
|
Charges.
|
260.7
|
4.71
|
Repairs &
|
ABS CPI, Transportation Group, Motor Vehicle
|
|
|
Maintenance
|
Repair and Servicing
|
169.4
|
6.43
|
Tyres
|
ABS CPI, Transportation Group, Motor Vehicle
|
|
|
|
Parts and Accessories
|
142.5
|
1.26
|
Fuel
|
AIP NSW State Average for the Retail Price of
|
116.773
|
15.65
|
|
diesel (excluding GST), calculated by determining
|
|
|
|
the average of the weekly figures between the end
|
|
|
|
of the quarter relating to the last variation and the
|
|
|
|
end of the quarter prior to any new variation. Such
|
|
|
|
calculations must only take into consideration
|
|
|
|
figures for each relevant full quarter of the year.
|
|
|
|
The end of quarters are as follows: December 31,
|
|
|
|
March 31, June 30 and September 30.
|
|
|
Administration
|
ABS CPI, All Groups, Sydney
|
172.5
|
2.33
|
Total
|
|
|
100
|
3. Each cost
component shall be re-weighted after each adjustment.
4. The Union, the
Industry Principal Contractors, and their nominated representatives shall confer
with a view to reaching agreement on any application for adjustment.
5. If the combined
benchmarks for the cost components of fuel, insurances, tyres, and repairs and
maintenance move between adjustments to the extent that a variation to the
total rates of more than either a positive or negative 2 per cent, then an
interim adjustment to the rates may be applied for.
6. Any variation
to rates payable within this determination shall take effect not earlier than
the first full pay period to commence three (3) months after the date which
such variation is approved by the Industrial Relations Commission of New South
Wales. This shall not apply to any interim adjustment.
6. This variation
shall operate from the first full pay period to commence on or after 23 March
2011.
A.
MACDONALD, Commissioner
____________________
Printed by