State Crest
New South Wales Industrial Relations Commission
(Industrial Gazette)





spacer image spacer image

Transport Industry - Excavated Materials, Contract Determination
  
Date12/25/2009
Volume369
Part5
Page No.1153
DescriptionVCD - Variation of Contract Determination
Publication No.C7159
CategoryAward
Award Code 680  
Date Posted12/23/2009

spacer image spacer image

spacer image Click to download*
spacer image
(680)

(680)

SERIAL C7159

 

Transport Industry - Excavated Materials, Contract Determination

 

INDUSTRIAL RELATIONS COMMISSION OF NEW SOUTH WALES

 

Application by Transport Workers' Union of New South Wales, Industrial Organisation of Employees.

 

(No. IRC 1114 of 2009)

 

Before Commissioner Connor

19 August 2009

 

AWARD

 

1.        Delete Part B - Rates of Remuneration, of the contract determination published 24 October 1997 (301 I.G. 1082) and insert in lieu thereof the following:

 

Part B

 

Rates of Remuneration

 

Item

2 Axles

3 Axles

4 Axles

5 Axles

6 Axles

7 Axles

 

 ($)

 ($)

 ($)

 ($)

 ($)

 ($)

1.        Loading Rate

17.607

27.416

33.297

39.617

42.663

46.354

1A. Extra capacity (per cubic metre)

3.034

3.034

3.034

3.034

3.034

3.034

2.        Kilometre Rate (0-8)

4.428

6.897

8.376

9.967

10.730

11.661

2A. Extra Capacity (per cubic metre)

0.764

0.764

0.764

0.764

0.764

0.764

3.        Kilometre Rate (over 8-25)

4.097

6.381

7.752

9.222

9.934

10.793

3A. Extra Capacity (per cubic metre)

0.707

0.707

0.707

0.707

0.707

0.707

4.        Kilometre Rate (over 25)

3.797

5.911

7.183

8.548

9.198

9.991

4A. Extra Capacity (per cubic metre)

0.656

0.656

0.656

0.656

0.656

0.656

5.        City Rate

10.537

16.409

19.928

30.991

34.640

38.164

5A. Extra Capacity (per cubic metre)

1.823

1.823

1.823

1.823

1.823

1.823

6.        Hourly Rate

57.727

89.887

109.210

129.840

139.831

159.107

6A. Extra Capacity (per cubic metre)

9.985

9.985

9.985

9.985

9.985

9.985

7.        Ramp Rate

4.706

7.328

8.899

13.840

15.471

17.041

7A. Extra Capacity (per cubic metre)

0.813

0.813

0.813

0.813

0.813

0.813

8.Large Material

17.148

26.704

32.433

50.444

56.377

62.106

8A. Extra Capacity (per cubic metre)

2.967

2.967

2.967

2.967

2.967

2.967

 

2.        Delete Part C - Rise and Fall Formula, and insert in lieu thereof the following:

 

PART C

 

Rise and Fall Formula

 

A.       Benchmarks

 

Component

Benchmark

Wages

Transport Industry (State) Award, as varied,

 

 ‘Transport Worker Grade 4’

 

 

Fuel

BP Terminal Gate Price for Diesel Fuel

 

Sydney

 

 

Repair Parts

Index based upon the following specified

 

basked of parts obtained from source listed

 

at recommended retail prices, including

 

Sales Tax

 

 

 

 

 

 

 

 

 

 

Parts

Rear Suspension

 

 

 

Bushes

 

 

 

 

 

 

 

Brake Lines

 

 

 

Brake Drums

 

 

 

Clutch and

 

 

 

Pressure Plate

 

Source

Vehicle Type

Item

Part

 

 

Hino

Rear Suspension

Brakes

 

 

Brake Linings

 

 

 

Brake Drums

 

 

 

Clutch and Pressure Plate

 

 

Ford

Rear Suspension

 

 

 

Brake Linings

 

 

 

Brake Drums

 

 

 

Clutch and Pressure Plate

 

 

Volvo

Rear Suspension

 

 

 

Brake Linings

 

 

 

Brake Drums

 

 

 

Clutch and Pressure Plate

 

 

International

Rear Suspension

 

 

 

Brake Linings

 

 

 

Brake Drums

 

 

 

Clutch and Pressure Plate

 

 

NOTE: Price is the total retail price inclusive of GST and excluding all discounts.

 

Tyres: Goodyear Tyre Co. Head Office recommended retail price for A steer 11R22.5 tyre only.

 

Quotes: Quotes for vehicles and tyres should be from the same source and be the same model number and if not possible the closest equivalent model.

 

Depreciation: Index based on the average of the recommended retail price of two cheapest vehicles - as per specification details below.

 

The index is the total of the prices.

 

Rigid Three Axle Bogie

 

Manufacturer:

Hino, Ford, Volvo or International

Differential:

40,000 pounds

Gearbox:

15 speed minimum

Horsepower:

300 hp

Carrying Capacity:

9 cubic metres minimum

Insurance:

Miller & Associates quote of the average of the two vehicles selected for the index

 

 

Registration and Third Party:

Roads and Traffic Authority

Interest:

Westpac, Prime Overdraft Rate

Sundries:

Based on Increase of CPI

 

B.       Weightings for Cost Components

 

Cost Component

Percentage of Total Cost

Repairs and Maintenance

16.2

Fuel

12.5

Tyres

6.3

Insurance

5.3

Registration

2.5

Depreciation

14.4

Wages

31.7

Interest

7.8

Sundries

3.3

Total:

100

 

3.        This variation shall take effect from the first pay period to commence on or after 19 August 2009.

 

 

 

 

 

P. J. CONNOR, Commissioner

 

 

 

____________________

 

 

Printed by the authority of the Industrial Registrar.

 

 

 

* to download attachment
  
IE UsersRight click the attachment - Click 'Save Target As' - Select a location - Click 'Save'
Netscape UsersRight click the attachment - Select 'Save Link As' - Select a location - Click 'Save'