Transport Industry - Quarried Materials, &c., Carriers Contract Determination
  
Date08/28/2009
Volume368
Part4
Page No.1734
DescriptionVCD - Variation of Contract Determination
Publication No.C7044
CategoryAward
Award Code 687  
Date Posted08/27/2009

spacer image spacer image

spacer image Click to download*
spacer image
(687)

(687)

SERIAL C7044

 

Transport Industry - Quarried Materials, &c., Carriers Contract Determination

 

INDUSTRIAL RELATIONS COMMISSION OF NEW SOUTH WALES

 

Application by Boral Construction Materials Group Limited.

 

(No. IRC 491 of 2009)

 

Before Commissioner McKenna

1 May 2009

 

CONTRACT DETERMINATION

 

1.        Delete paragraph (c) of subclause (vi) of clause 2, Cartage Rates of the award published 14 August 1992 (271 I.G. 78), and insert in lieu thereof the following:

 

(c)      the carrier has been requested to apply for the rebate pursuant to the scheme by the principal contractor; the principal contractor may reduce the cartage rates payable in Annexure "A" of this determination up to a maximum reduction of 4.74% of the rate otherwise payable to the carrier for the performance of that contract of carriage.

 

2.        Delete Schedule 1, Quantity/Distance and Hourly Hire Rates, of Annexure "A", Cartage Rates, and insert in lieu thereof the following:

 

SCHEDULE 1

 

QUANTITY/DISTANCE AND HOURLY HIRE RATES

 

Symbol

Item

Rate ($)

Unit

F.F

Flag Fall

3.5867

Per Tonne

A

 

0.2112

Per Tonne

B

 

0.1923

Per Tonne

C

 

0.1815

Per Tonne

D

 

0.1625

Per Tonne

E

 

0.1535

Per Tonne

F

 

0.1444

Per Tonne

G

 

0.1372

Per Tonne

H

Large Material

1.0797

Per Tonne

I

Large Material 600+ material

1.8254

Per Tonne

Hourly Rates - non permitted in external dumping

J

2 Axle Vehicle

49.436

Per Hour

K

3 Axle Vehicle

59.475

Per Hour

L

4  Axle Vehicle

68.972

Per Hour

M

5 Axle Vehicle

88.869

Per Hour

N

6 Axle Vehicle

93.997

Per Hour

Hourly rates for vehicles involved in internal dumping

O

2 Axle Vehicle

65.379

Per Hour

P

3 Axle Vehicle

68.412

Per Hour

Q

4  Axle Vehicle

79.318

Per Hour

R

5 Axle Vehicle

102.230

Per Hour

S

6 Axle Vehicle

106.645

Per Hour

 

3.        Delete Schedule 2, Cost Component Formula, of Annexure "B", Rise and Fall Formula, and insert in lieu thereof the following:

 

SCHEDULE 2

 

COST COMPONENT FORMULA

 

Component

New weighting

Wages inc Maintenance Labour

34.58677

Fuel and Oil

19.91342

Repair Parts

12.46382

Tyres

4.11288

Depreciation

10.28165

Registration

3.15916

Other Fixed Costs

15.4823

TOTAL

100

 

4.        Delete Schedule 3, Benchmarks, of Annexure "B", and insert in lieu thereof the following:

 

SCHEDULE 3

 

BENCHMARKS

 

Applications for adjustment shall be made by reference to movements in the following benchmarks for each of the following cost components:

 

Component

Benchmark

Confirmed base

Source of figures to be used

Labour

Transport

 

NSW Industrial Gazette, or if latest rate not

 

Industry -

$621.80

gazetted the latest Order of the Industrial

 

Quarried

 

Relations Commission of New South Wales

 

Materials State

 

 

 

Award - Grade 2,

 

 

 

Vehicle Class 3,

 

 

 

Certified

 

 

Fuel

AIP NSW State

110.00 (121.00

Available on Australian Institute of

 

weekly average

cents per litre

Petroleum on 5 April 2009 at

 

for the retail

less 1/11th GST)

www.aip.com.au/pricing/retail/diesel/index.htm

 

price of diesel,

 

 

 

excluding GST

 

 

Repair parts

ABS Consumer

 

Australian Bureau of Statistics Consumer

 

Price Index

156.70

Price Index Series 6401.0 March Quarter

 

(CPI),

 

2008

 

Transportation

 

 

 

Group, Private

 

 

 

Motoring Motor

 

 

 

Vehicle repair

 

 

 

and servicing

 

 

Tyres

ABS Consumer

 

Australian Bureau of Statistics Consumer

 

Price Index (CPI),

130.40

Price Index Series 6401.0 March Quarter

 

Transportation

 

2008

 

Group, Private

 

 

 

Motoring Motor

 

 

 

vehicle parts and

 

 

 

accessories

 

 

Depreciation

ABS Consumer

 

Australian Bureau of Statistics Consumer

 

Price Index(CPI),

98.50

Price Index Series 6401.0 March Quarter

 

Transportation

 

2008

 

Group, Private

 

 

 

Motoring Motor

 

 

 

vehicles

 

 

Registration

Registration and

Registration =

Roads and Traffic Authority (Registration)

 

Green Slip

$1,071.91 made up

and GIO Insurance (Green Slip)

 

(no excess cost)

of:

 

 

of a 3 axle truck,

$52.00 - Rego Fee

 

 

without trailer,

(no GST)

 

 

working and

$859.00 -

 

 

garaged in the

Road Usage Charge

 

 

Sydney

(no GST)

 

 

Metropolitan

$160.91

 

 

Area with a tare

Heavy Vehicle

 

 

weight of 10

Inspections

 

 

tonne and a

(including GST)

 

 

registered GVM

Green Slip =

 

 

of greater than 16

$3,623

 

 

tonne

Total = $4,694.91

 

 

 

 

 

Other Fixed

ABS Consumer

 

Australian Bureau of Statistics Consumer

Costs

Price Index (CPI),

161.70

Price Index Series 6401.0 March Quarter

 

Sydney

 

2008

 

All Groups

 

 

 

5.        This variation shall take effect from 11 May 2009.

 

 

 

 

D. S. McKENNA, Commissioner.

 

 

 

____________________

 

 

Printed by the authority of the Industrial Registrar.