Transport Industry - Excavated Materials, Contract Determination
  
Date11/28/2008
Volume366
Part5
Page No.1463
DescriptionVCD - Variation of Contract Determination
Publication No.C6770
CategoryAward
Award Code 680  
Date Posted11/28/2008

spacer image spacer image

spacer image Click to download*
spacer image
(680)

(680)

SERIAL C6770

 

Transport Industry - Excavated Materials, Contract Determination

 

INDUSTRIAL RELATIONS COMMISSION OF NEW SOUTH WALES

 

Application by Transport Workers' Union of New South Wales, Industrial Organisation of Employees.

 

(No. IRC 1456 of 2008)

 

Before Commissioner Macdonald

24 September 2008

 

VARIATION

 

1.        Delete Part B, Rates of Remuneration, of the contract determination published 24 October 1997 (301 I.G. 1082) and insert in lieu thereof the following:

 

PART B

 

RATES OF REMUNERATION

 

Item

2 Axles

3 Axles

4 Axles

5 Axles

6 Axles

7 Axles

 

($)

($)

($)

($)

($)

($)

1.  Loading Rate

16.666

25.950

31.516

37.498

40.381

43.875

1A. Extra capacity (per cubic metre)

2.871

2.871

2.871

2.871

2.871

2.871

2.  Kilometre Rate (0-8)

4.191

6.528

7.928

9.434

10.156

11.037

2A. Extra Capacity (per cubic metre)

0.724

0.724

0.724

0.724

0.724

0.724

3.  Kilometre Rate (over 8-25)

3.878

6.040

7.337

8.729

9.403

10.216

3A. Extra Capacity (per cubic metre)

0.669

0.669

0.669

0.669

0.669

0.669

4.  Kilometre Rate (over 25)

3.594

5.595

6.799

8.091

8.706

10.216

4A. Extra Capacity (per cubic metre)

0.621

0.621

0.621

0.621

0.621

0.621

5.  City Rate

9.974

15.531

18.863

29.334

32.788

36.123

5A. Extra Capacity (per cubic metre)

1.725

1.725

1.725

1.725

1.725

1.725

6.  Hourly Rate

54.640

85.080

103.370

122.896

132.353

150.598

6A. Extra Capacity (per cubic metre)

9.451

9.451

9.451

9.451

9.451

9.451

7.  Ramp Rate

4.455

6.936

8.423

13.100

14.643

16.129

7A. Extra Capacity (per cubic metre)

0.770

0.770

0.770

0.770

0.770

0.770

8.  Large Material

16.231

25.276

30.698

47.746

53.362

58.785

8A. Extra Capacity (per cubic metre)

2.809

2.809

2.809

2.809

2.809

2.809

 

2.        This variation shall take effect from the first pay period to commence on or after 24 September 2008.

 

 

 

A. MACDONALD, Commissioner

 

 

____________________

 

 

Printed by the authority of the Industrial Registrar.