State Crest
New South Wales Industrial Relations Commission
(Industrial Gazette)





spacer image spacer image

TRANSPORT INDUSTRY - EXCAVATED MATERIALS, CONTRACT DETERMINATION
  
Date11/09/2007
Volume364
Part2
Page No.447
DescriptionVCD - Variation of Contract Determination
Publication No.C6156
CategoryAward
Award Code 680  
Date Posted11/09/2007

spacer image spacer image

spacer image Click to download*
spacer image
(680)

(680)

SERIAL C6156

 

Transport Industry - Excavated Materials, Contract Determination

 

INDUSTRIAL RELATIONS COMMISSION OF NEW SOUTH WALES

 

Application by Transport Workers' Union of New South Wales, Industrial Organisation of Employees.

 

(No. IRC 1278 of 2007)

 

Before Mr Deputy President Sams

12 October 2007

 

VARIATION

 

1.          Delete Part B, Rates of Remuneration, of the contract determination published 24 October 1997 (301 I.G. 1082) and insert in lieu thereof the following:

 

PART B

 

RATES OF REMUNERATION

 

Item

2 Axles

3 Axles

4 Axles

5 Axles

6 Axles

7 Axles

 

($)

($)

($)

($)

($)

($)

1.  Loading Rate

15.938

24.817

30.140

35.861

38.618

41.959

1A. Extra capacity (per cubic metre)

2.746

2.746

2.746

2.746

2.746

2.746

2.  Kilometre Rate (0-8)

4.008

6.243

7.582

9.022

9.713

10.555

2A. Extra Capacity (per cubic metre)

0.692

0.692

0.692

0.692

0.692

0.692

3.  Kilometre Rate (over 8-25)

3.709

5.776

7.017

8.348

8.992

9.770

3A. Extra Capacity (per cubic metre)

0.640

0.640

0.640

0.640

0.640

0.640

4.  Kilometre Rate (over 25)

3.437

5.351

6.502

7.738

8.326

9.770

4A. Extra Capacity (per cubic metre)

0.594

0.594

0.594

0.594

0.594

0.594

5.  City Rate

9.538

14.853

18.039

28.053

31.356

34.546

5A. Extra Capacity (per cubic metre)

1.650

1.650

1.650

1.650

1.650

1.650

6.  Hourly Rate

52.254

81.365

98.856

117.530

126.574

144.022

6A. Extra Capacity (per cubic metre)

9.038

9.038

9.038

9.038

9.038

9.038

7.  Ramp Rate

4.260

6.633

8.055

12.528

14.004

15.425

7A. Extra Capacity (per cubic metre)

0.736

0.736

0.736

0.736

0.736

0.736

8.  Large Material

15.522

24.172

29.358

45.661

51.032

56.218

8A. Extra Capacity (per cubic metre)

2.686

2.686

2.686

2.686

2.686

2.686

 

2.          This variation shall take effect from the first pay period to commence on or after the 16 August 2007.

 

 

 

P. J. SAMS D.P.

 

 

____________________

 

 

Printed by the authority of the Industrial Registrar.

 

* to download attachment
  
IE UsersRight click the attachment - Click 'Save Target As' - Select a location - Click 'Save'
Netscape UsersRight click the attachment - Select 'Save Link As' - Select a location - Click 'Save'