TRANSPORT INDUSTRY - EXCAVATED MATERIALS CONTRACT DETERMINATION
INDUSTRIAL RELATIONS
COMMISSION OF NEW SOUTH WALES
Application by Transport
Workers' Union of Australia, New South Wales Branch, industrial organisation of
employees.
(No. IRC 4900 of 2004)
Before Commissioner
Connor
|
12 August 2005
|
VARIATION
1. Delete Part
B, Rates of Remuneration, of the contract determination published 24 October
1997 (301 I.G. 1082) and insert in lieu thereof the following:
PART B
RATES OF
REMUNERATION
Interim Increase
Item
|
2 Axles
|
3 Axles
|
4 Axles
|
5 Axles
|
6 Axles
|
7 Axles
|
|
($)
|
($)
|
($)
|
($)
|
($)
|
($)
|
1. Loading Rate
|
14.371
|
22.377
|
27.176
|
32.335
|
34.820
|
37.833
|
1A. Extra capacity (per cubic metre)
|
2.477
|
2.488
|
2.488
|
2.488
|
2.488
|
2.488
|
2. Kilometre Rate
(0-8)
|
3.614
|
5.629
|
6.837
|
8.135
|
8.759
|
9.517
|
2A. Extra Capacity (per cubic metre)
|
0.625
|
0.625
|
0.625
|
0.625
|
0.625
|
0.625
|
3. Kilometre Rate
(over 8-25)
|
3.345
|
5.209
|
6.327
|
7.528
|
8.108
|
8.810
|
3A. Extra Capacity (per cubic metre)
|
0.577
|
0.577
|
0.577
|
0.577
|
0.577
|
0.577
|
4. Kilometre Rate
(over 25)
|
3.100
|
4.825
|
5.863
|
5.703
|
7.507
|
8.810
|
4A. Extra Capacity (per cubic metre)
|
0.536
|
0.536
|
0.536
|
0.536
|
0.536
|
0.536
|
5. City Rate
|
8.601
|
13.393
|
16.265
|
25.295
|
28.273
|
31.149
|
5A. Extra Capacity (per cubic metre)
|
1.488
|
1.488
|
1.488
|
1.488
|
1.488
|
1.488
|
6. Hourly Rate
|
47.116
|
73.364
|
89.134
|
105.972
|
114.126
|
129.858
|
6A. Extra Capacity (per cubic metre)
|
8.150
|
8.150
|
8.150
|
8.150
|
8.150
|
79.691
|
7. Ramp Rate
|
3.841
|
5.981
|
7.263
|
11.297
|
12.627
|
13.908
|
7A. Extra Capacity (per cubic metre)
|
0.664
|
0.664
|
0.664
|
0.664
|
0.664
|
0.664
|
8. Large Material
|
13.996
|
21.795
|
26.471
|
41.171
|
46.014
|
50.690
|
8A. Extra Capacity (per cubic metre)
|
2.422
|
2.422
|
2.422
|
2.422
|
2.422
|
2.422
|
2. Delete Part C
- Rise and Fall Formula and insert in lieu thereof the following:
PART C
Rise and Fall
Formula
A. Benchmarks
Component
|
Benchmark
|
Wages
|
Transport Industry (State) Award, as varied, Transport
Worker Grade 4
|
Fuel
|
B.P. Ltd Head Office Commercial wholesale Bulk, Price per
Litre of Taxable Distillate
|
Repair Parts
|
Index based upon the following specified basket of parts
obtained from source listed at recommended retail prices, including Sales Tax.
|
|
Parts
|
Rear Suspension Bushes
|
|
|
Brake Lines
|
|
|
Brake Drums
|
|
|
Clutch and Pressure Plate
|
Source
|
Vehicle Type
|
Item
|
Part
|
|
Hino
|
Rear Suspension
Brake Linings
Brake Drums
Clutch and
Pressure Plate
|
Brakes
|
|
Ford
|
Rear Suspension
Brake Linings
Brake Drums
Clutch and
Pressure Plate
|
|
|
Volvo
|
Rear Suspension
Brake Linings
Brake Drums
Clutch and
Pressure Plate
|
|
|
International
|
Rear Suspension
Brake Linings
Brake Drums
Clutch and
Pressure Plate
|
|
NOTE: Price is the total retail price inclusive of GST and excluding all discounts.
Tyres: Goodyear Tyre Co. Head Office recommended retail price for A steer 11R22.5 tyre only.
Quotes: Quotes for vehicles
and tyres should be from the same source and be the same model number and if
not possible the closest equivalent model.
Depreciation: Index based on the average of the recommended
retail price of two cheapest vehicles - as per specification details below.
The index is the total of the prices.
Rigid three axle bogie
|
Manufacturer:
|
Hino, Ford, Volvo, or International
|
Differential:
|
40,000 pounds
|
Gearbox:
|
15 speed minimum.
|
Horsepower:
|
300 hp
|
Carrying capacity:
|
9 cubic metres minimum.
|
Insurance:
|
Miller & Associates quote of the average of the two
vehicles selected for the index.
|
Registration and Third Party Insurance
|
Roads and Traffic Authority
|
Interest
|
Westpac, Prime Overdraft Rate
|
Sundries
|
Based on Increase of C.P.I.
|
B. Weightings of
Cost Components
Cost Component
|
Percentage of Total Cost
|
Fuel
|
16.2
|
Repairs and Maintenance
|
12.5
|
Tyres
|
6.3
|
Insurance
|
5.3
|
Registration
|
2.5
|
Depreciation
|
14.4
|
Wages
|
31.7
|
Interest
|
7.8
|
Sundries
|
3.3
|
Total:
|
100.00
|
3. This
variation shall take effect from the first pay period to commence on or after
the 12th August 2005.
P. J. CONNOR, Commissioner.
____________________
Printed by the
authority of the Industrial Registrar.