State Crest
New South Wales Industrial Relations Commission
(Industrial Gazette)





spacer image spacer image

TRANSPORT INDUSTRY - EXCAVATED MATERIALS, CONTRACT DETERMINATION
  
Date11/26/2004
Volume347
Part5
Page No.
Description(VCD)
Publication No.C3232
CategoryAward
Award Code 680  
Date Posted11/25/2004

spacer image spacer image

spacer image Click to download*
spacer image
BEFORE THE INDUSTRIAL RELATIONS COMMISSION

(680)

SERIAL C3232

 

TRANSPORT INDUSTRY - EXCAVATED MATERIALS, CONTRACT DETERMINATION

 

INDUSTRIAL RELATIONS COMMISSION OF NEW SOUTH WALES

 

Application by Transport Workers' Union of Australia, New South Wales Branch, an association of contract carriers.

 

(No. IRC 4900 of 2004)

 

Before Commissioner Connor

24 September 2004

 

VARIATION

 

1.          Delete Part B, Rates of Remuneration, of the contract determination published 24 October 1997 (301 I.G. 1082) and insert in lieu thereof the following:

 

PART B

 

RATES OF REMUNERATION

 

Interim Increase

 

Item

2 Axles

3 Axles

4 Axles

5 Axles

6 Axles

7 Axles

 

$

$

$

$

$

$

1.    Loading Rate

13.459

20.957

25.451

30.283

32.610

35.432

1A. Extra capacity (per cubic metre)

2.32

2.33

2.33

2.33

2.33

2.33

2.    Kilometre Rate (0-8)

3.385

5.272

6.403

7.619

8.203

8.913

2A. Extra Capacity (per cubic metre)

0.5855

0.5855

0.5855

0.5855

0.5855

0.5855

3.    Kilometre Rate (over 8-25)

3.133

4.878

5.925

7.050

7.593

8.251

3A. Extra Capacity (per cubic metre)

0.54

0.54

0.54

0.54

0.54

0.54

4.    Kilometre Rate (over 25)

2.903

4.519

5.491

5.341

7.031

8.251

4A. Extra Capacity (per cubic metre)

0.5021

0.5021

0.5021

0.5021

0.5021

0.5021

5.    City Rate

8.055

12.543

15.233

23.690

26.479

29.172

5A. Extra Capacity (per cubic metre)

1.3936

1.3936

1.3936

1.3936

1.3936

1.3936

6.    Hourly Rate

44.126

68.708

83.477

99.246

106.883

121.616

6A. Extra Capacity (per cubic metre)

7.6330

7.6330

7.6330

7.6330

7.6330

74.6330

7.    Ramp Rate

3.597

5.601

6.802

10.580

11.826

13.025

7A. Extra Capacity (per cubic metre)

0.6223

0.6223

0.6223

0.6223

0.6223

0.6223

8.   Large Material

13.108

20.412

24.791

38.558

43.094

47.473

8A. Extra Capacity (per cubic metre)

2.2681

2.2681

2.2681

2.2681

2.2681

2.2681

 

2.          This variation will take effect on and from the first pay period to commence on or after 24 September 2004.

 

 

 

P. J. CONNOR, Commissioner.

 

 

____________________

 

 

Printed by the authority of the Industrial Registrar.

 

* to download attachment
  
IE UsersRight click the attachment - Click 'Save Target As' - Select a location - Click 'Save'
Netscape UsersRight click the attachment - Select 'Save Link As' - Select a location - Click 'Save'