TRANSPORT INDUSTRY - EXCAVATED MATERIALS CONTRACT DETERMINATION
INDUSTRIAL RELATIONS
COMMISSION OF NEW SOUTH WALES
Application by Transport
Workers' Union of Australia, New South Wales Branch, an association of contract
carriers, for a variation of the said determination.
(No. IRC 3670 of 2003)
Before Commissioner
Connor
|
13 August 2003
|
VARIATION
1. Delete Part B
- Rates of Remuneration, of the contract determination published 24 October 1997
(301 I.G. 1082) and insert in lieu thereof the following:
Part B
Rates of Remuneration
Item
|
2 Axles
|
3 Axles
|
4 Axles
|
5 Axles
|
6 Axles
|
7 Axles
|
|
$
|
$
|
$
|
$
|
$
|
$
|
1. Loading Rate
|
13.200
|
20.554
|
24.962
|
29.701
|
31.983
|
34.751
|
1A. Extra capacity (per
|
|
|
|
|
|
|
cubic metre)
|
2.28
|
2.28
|
2.28
|
2.28
|
2.28
|
2.28
|
2. Kilometre Rate (0-8)
|
3.320
|
5.171
|
6.280
|
7.473
|
8.045
|
8.742
|
2A. Extra Capacity (per
|
|
|
|
|
|
|
cubic metre)
|
0.5742
|
0.5742
|
0.5742
|
0.5742
|
0.5742
|
0.5742
|
3. Kilometre Rate
|
|
|
|
|
|
|
(over 8-25)
|
3.073
|
4.784
|
5.811
|
6.914
|
7.447
|
8.092
|
3A. Extra Capacity (per
|
0.53
|
0.53
|
0.53
|
0.53
|
0.53
|
0.53
|
cubic metre)
|
|
|
|
|
|
|
4. Kilometre Rate (over 25)
|
2.847
|
4.432
|
5.385
|
5.238
|
6.896
|
8.092
|
4A. Extra Capacity (per
|
|
|
|
|
|
|
cubic metre)
|
0.4924
|
0.4924
|
0.4924
|
0.4924
|
0.4924
|
0.4924
|
5. City Rate
|
7.900
|
12.302
|
14.940
|
23.235
|
25.970
|
28.611
|
5A. Extra Capacity (per
|
|
|
|
|
|
|
cubic metre)
|
1.3668
|
1.3668
|
1.3668
|
1.3668
|
1.3668
|
1.3668
|
6. Hourly Rate
|
43.278
|
67.387
|
81.872
|
97.338
|
104.828
|
119.278
|
6A. Extra Capacity (per
|
|
|
|
|
|
|
cubic metre)
|
7.4863
|
7.4863
|
7.4863
|
7.4863
|
7.4863
|
7.4863
|
7. Ramp Rate
|
3.528
|
5.493
|
6.671
|
10.377
|
11.599
|
12.775
|
7A. Extra Capacity (per
|
|
|
|
|
|
|
cubic metre)
|
0.6103
|
0.6103
|
0.6103
|
0.6103
|
0.6103
|
0.6103
|
8. Large Material
|
12.856
|
20.020
|
24.314
|
37.817
|
42.266
|
46.560
|
8A. Extra Capacity (per
|
|
|
|
|
|
|
cubic metre)
|
2.2245
|
2.2245
|
2.2245
|
2.2245
|
2.2245
|
2.2245
|
2. This variation
shall take effect from the beginning of the first pay period to commence on or
after 13 August 2003.
P. J. CONNOR, Commissioner.
____________________
Printed by
the authority of the Industrial Registrar.