TRANSPORT INDUSTRY - QUARRIED MATERIALS, &c., CARRIERS CONTRACT DETERMINATION
  
Date08/22/2003
Volume341
Part1
Page No.
DescriptionVIRC - Variation by Industrial Relations Commission
Publication No.C1990
CategoryContract Determination
Award Code 687  
Date Posted08/21/2003

spacer image spacer image

spacer image Click to download*
spacer image
BEFORE THE INDUSTRIAL RELATIONS COMMISSION

(687)

SERIAL C1990

 

TRANSPORT INDUSTRY - QUARRIED MATERIALS, &c., CARRIERS CONTRACT DETERMINATION

 

INDUSTRIAL RELATIONS COMMISSION OF NEW SOUTH WALES

 

Application by Transport Workers' Union of Australia, New South Wales Branch, industrial organisation of employees.

 

(No. IRC 6855 of 2002)

 

Before Commissioner Connor

26 June 2003

 

VARIATION

 

1.          Delete subclauses (vi), (vii) and (viii) of clause 2, Cartage Rates, of the determination published 14 August 1992 (271 I.G. 78), and insert in lieu thereof the following:

 

(vi)       Where:

 

(a)        a carrier performs a contract of carriage within the area, incidence and duration of this determination; and

 

(b)       the carrier is eligible to claim a rebate pursuant to the Commonwealth Government's Diesel and Alternative Fuel Grant Scheme ("the scheme") for that contract of carriage; and

 

(c)        the carrier has been requested to apply for the rebate pursuant to the scheme by the principal contractor;

 

the principal contractor may reduce the cartage rates payable in Annexure "A" of this determination up to a maximum reduction of 4.01% of the rate otherwise payable to the carrier for the performance of that contract of carriage.

 

(vii)      Should a carrier become ineligible to claim a rebate pursuant to the scheme or the scheme is abolished then the principal contractor shall not be permitted to reduce the cartage rates pursuant to subclause 2(vi).

 

(viii)     Should the scheme be abolished, altered or modified, leave is reserved to the parties to make application in relation to subclauses 2(vi) and (vii).

 

2.          Delete Schedule 1 - Quantity/Distance and Hourly Hire Rates, of Annexure "A", Cartage Rates, and insert in lieu thereof the following:

 

SCHEDULE 1

 

QUANTITY/DISTANCE AND HOURLY HIRE RATES

 

Symbol

Item

Rate

Unit

 

 

$

 

F.F

Flag Fall

3.097

Per Tonne

A

 

0.182

Per Tonne

B

 

0.166

Per Tonne

C

 

0.156

Per Tonne

D

 

0.141

Per Tonne

E

 

0.132

Per Tonne

F

 

0.125

Per Tonne

G

 

0.119

Per Tonne

H

Large Material

0.932

Per Tonne

I

Large Material 600 + Material

1.576

Per Tonne

Hourly rates for non-permitted vehicles involved in external dumping

J

2 Axle Vehicle

42.68

Per Hour

K

3 Axle Vehicle

51.37

Per Hour

L

4 Axle Vehicle

59.56

Per Hour

M

5 Axle Vehicle

76.75

Per Hour

N

6 Axle Vehicle

81.16

Per Hour

Hourly rates for vehicles involved in internal dumping

O

2 Axle Vehicle

56.45

Per Hour

P

3 Axle Vehicle

59.07

Per Hour

Q

4 Axle Vehicle

68.49

Per Hour

R

5 Axle Vehicle

88.28

Per Hour

S

6 Axle Vehicle

92.09

Per Hour

 

3.          Delete Schedule 1: Procedures, Schedule 2: Cost Component Formula, and Schedule 3, Benchmarks, of Annexure "B", Rise and Fall Formula, and insert in lieu thereof the following:

 

SCHEDULE 1

 

PROCEDURES

 

1.          Variations to the rates detailed in Annexure "A" shall be made by the Industrial Relations Commission of New South Wales upon application.

 

2.          Variations shall be established by ascertaining the percentage change in the various cost components contained at Schedule 3, Benchmarks from the time the last variation of the rates was calculated to the specified Review Date:

 

2.1        The Review Date shall be:

 

1 June

 

2.2        If for any reason a relevant figure is not available or obtained at the Review Date the latest available figure is to be taken..  Adjustment will be made when figures are next determined for the difference between figure at the Review Date and the figure used as calculated above.

 

2.2.       The latest available figures for each component will then be expressed as a percentage increase of the figure last used for that component in the previous rise and fall calculation.

 

2.3.       The Percentage Increase/Decrease calculated for each component is then to be applied to the percentage of total cost of that component to drive the new percentage of Total Cost figure.

 

2.4.       The sum of the new percentage of Total Cost figures minus 100% shall be the Percentage Increase to apply.  All costs are to be the latest available from the source reference as at 1 June.  All rates for symbols F.F and A through to I are to be expressed to 3 decimal points.  When preparing schedules of rates payable per unit quantity for various distances, the rates for flag fall and the distance are to be calculated each using 3 decimal points and the final figure from the addition of the flag fall and the "distance" amount then rounded to two decimal points.  When calculating rates per cubic metre, the final figure per tonne to 3 decimal points from the addition of the flag fall and the distance is to be multiplied by the relevant conversion factor, and the resultant figure then rounded to two decimal points to obtain the rate per cubic metre.

 

2.5.       Following each application of the formula, the cost components shall be re-weighted to indicate the new percentage.

 

2.6.       If the non labour cost components increase between adjustments to the extent that it causes an increase to the total rate of 3 percent or more, then an interim adjustment to the rates may be applied for and made.

 

3.          The resulting percentage change shall be applied to all rates in Schedule 1 of Annexure "A" hereto.

 

4.          A variation to the rates shall not be retrospective in operation.

 

5.          The variation to the rates shall be effective from the date determined by the Industrial Relations Commission (such date should not be before one month after the Review Date), provided that principal contractors have sufficient time to give appropriate notice to their customers.

 

6.          The parties shall confer with a view to reaching agreement on any application for adjustment to the rates.

 

SCHEDULE 2

 

COST COMPONENT FORMULA

 

Cost Component as at 1 June 2003

Percentage of Cost

Wages Including Maintenance Labour

34.61

Fuel and Oil

17.66

Repair Parts

12.50

Tyres

4.11

Depreciation

12.85

Registration

2.49

Other Fixed Costs

15.78

TOTAL

100.00

 

SCHEDULE 3

 

BENCHMARKS

 

Applications for adjustment shall be made by reference to movements in the following benchmarks for each of the following cost components:

 

Component

Benchmark

Confirmed

Source of figures to be used

 

 

base at

 

 

 

1.6.03 ($)

 

Labour

Transport

536.50

NSW Industrial Gazette, or if latest rate not gazetted

 

Industry -

 

the latest Order of the Industrial Relations

 

Quarried

 

Commission of New South Wales

 

Materials State

 

 

 

Award - Grade 2,

 

 

 

Vehicle Class 3,

 

 

 

Certified

 

 

Fuel

Caltex Metro

86.27

Caltex’s Internet home page at

 

Card Price,

(94.90 cents

www.caltex.com.au/pricing/cardpricing.html

 

per litre of

per litre less

 

 

Diesel for NSW,

1/11th GST)

 

 

excluding GST

 

 

 

Repair Parts

ABS Consumer

135.5

Australian Bureau of Statistics Consumer Price Index

 

Price Index

 

Series 6401.0 March Quarter 2003

 

(CPI),

 

 

 

Transportation

 

 

 

Group, Private

 

 

 

Motoring Motor

 

 

 

Vehicle repair

 

 

 

and servicing

 

 

Tyres

ABS Consumer

111.8

Australian Bureau of Statistics Consumer Price Index

 

Price Index

 

Series 6401.0 March Quarter 2003

 

(CPI),

 

 

 

Transportation

 

 

 

Group, Private

 

 

 

Motoring Motor

 

 

 

vehicle parts and

 

 

 

accessories

 

 

Depreciation

ABS, Consumer

106.1

Australian Bureau of Statistics Consumer Price Index

 

Price Index

 

Series 6401.0 March Quarter 2003

 

(CPI),

 

 

 

Transportation

 

 

 

Group, Private

 

 

 

Motoring Motor

 

 

 

Vehicles

 

 

Registration

Registration and

3,368.04

Roads and Traffic Authority (Registration) and GIO

 

Green Slip

(Registration

Insurance (Green Slip)

 

Insurance Cost

1,049 +

 

 

(no excess cost)

2,655.84

 

 

of a 3 axle truck,

Green Slip =

 

 

without trailer,

3,704.84

 

 

working and

Less 1/11th

 

 

garaged in the

GST)

 

 

Sydney

 

 

 

Metropolitan

 

 

 

Area with a tare

 

 

 

weight of 10

 

 

 

tonne and a

 

 

 

registered GVM

 

 

 

of greater than 16

 

 

 

tonne

 

 

Other Fixed

ABS Consumer

142.1

Australian Bureau of Statistics Consumer Price Index

Costs

Price Index (CPI)

 

Series 6401.0 March Quarter 2003

 

Sydney All

 

 

 

Groups

 

 

 

 

4.          This variation shall take effect on and from 26 June 2003.

 

 

P. J. CONNOR, Commissioner.

 

 

____________________

 

 

Printed by the authority of the Industrial Registrar.

 