Building
Industry - Contract Floor Layer Minimum Rate Order Award
INDUSTRIAL RELATIONS
COMMISSION OF NEW SOUTH WALES
Application by NSW
Industrial Registrar.
(No. IRC 1880 of 2009)
Before Commissioner
Bishop
|
23 December 2009
|
VARIATION
1. Delete clause
2, Rates of Payment, of the award published 29 April 2005 (350 I.G. 559), and
insert in lieu thereof the following:
2. Rates of Payment
Schedule of
Commercial Rates
|
$
|
Daily Minimum Charge
|
150.51
|
Hourly Rate
|
40.72
|
Fixing Rates
|
|
Vinyl Tiles 20-49m2
|
7.05
|
|
50-100m2
|
5.63
|
|
100-249m2
|
4.22
|
|
250 and over
|
3.04
|
Sheet Vinyl (incl. Welding)
|
|
|
20-49m2
|
7.98
|
|
50-249m2
|
5.47
|
|
250 and over
|
4.88
|
For Safety Vinyl and Corlon
|
1.76
|
For Safety Vinyl over 3mm
|
2.68
|
For Linoleum
|
2.68
|
Hardboard Underlay (including supply of staples by
contractor)
|
|
|
20-49m2
|
7.52
|
|
50m2 and over
|
5.16
|
Restaple Hardboard m2
|
2.17
|
Hardboard Underlay on pineboard
|
|
|
M2 Additional Rate
|
0.77
|
Decorative Tiles - VT rate + 50%
|
|
Decorative Tiles - Boarders and squares - Decorative Tile
+ 50%
|
|
Cork Tile - laying out m2
|
9.46
|
PVC nosing Lin Metre
|
4.77
|
Aluminium Nosing to Timber per lm
|
6.46
|
Aluminium Nosing to Concrete per lm
|
10.97
|
Stair Treads per lm
|
5.82
|
Stair Risers per lm
|
5.82
|
Treads and Risers covered per lm
|
10.97
|
Ripple trims to timber per lm
|
3.23
|
Ripple trims to concrete per lm
|
5.82
|
100mm skirting per lm
|
2.53
|
150mm skirting per lm
|
3.16
|
100mm flat skirting over carpet or smoothedge - per lm
|
3.31
|
150mm flat skirting over carpet or smoothedge - per lm
|
3.71
|
Reducing and capping strip - per lm
|
2.87
|
Preform cove - per lm
|
2.20
|
Stringer to walls per lm
|
4.99
|
Stringer to stairs per lm
|
13.23
|
Cementuous skim coat 1mm
|
2.37
|
Smoothing compound (k15/k10)
|
2.87
|
|
Above two items include priming and sanding
|
|
Cement based primer
|
2.34
|
Two pack primer
|
0.77
|
Grinding concrete - hourly rate
|
39.78
|
Acid etch etc - hourly rate
|
39.78
|
Fill expansion joints - hourly rate
|
39.78
|
|
Raking and cutting included in rates
|
|
Cover sheet vinyl up to 100mm height per lm
|
5.82
|
Cover sheet vinyl over 100mm height per lm
|
6.46
|
Rubber tiles m2
|
10.90
|
Sheet Vinyl to walls (incl. Welding)
|
14.04
|
Bulletin Board m2
|
18.75
|
Take Ups
|
|
|
Take up
|
|
loose lay m2
|
1.80
|
|
Take up
|
|
stuck m2
|
5.52
|
|
Take up
|
|
PVA mr
|
9.12
|
|
Take up
|
|
hardboard and coverings including removal of
|
|
|
|
|
staples m2
|
|
|
Take up
|
|
stair tread nosing (PVC) - per lm
|
1.47
|
|
Take up
|
|
stair tread nosing (Alum) - per lm
|
5.52
|
Bar Tops
|
45.48
|
Fares/Travel
|
|
|
Travelling time outside
metropolitan area per hour
|
33.77
|
|
Accommodation per day
|
107.94
|
|
Travelling per km
return
|
1.01
|
Moving Furniture - Hourly Rate
|
39.78
|
Cancellation Fee
|
48.16
|
|
|
|
|
|
|
|
SCHEDULE OF
DOMESTIC FIXING RATES
Minimum Charge
|
$
|
183cm x 2m vinyls (except inlaid) - 1m
|
20.35
|
183cm inlaid vinyl (if layer supplies template paper - 1m
|
24.01
|
274cm vinyl - 1m
|
27.15
|
366cm x 4m vinyl - 1m
|
32.43
|
Daytile with border and squares m2
|
14.63
|
Vinyl tiles m2
|
11.36
|
Hardboard m2
|
8.13
|
K10 and Ardit (labour only) m2
|
3.04
|
PVA (labour only) m2
|
12.01
|
Additional rate for stairs in addition to rate per metre -
per stair
|
5.37
|
Cove skirting - 1m
|
4.81
|
Preform fillet - 1m
|
3.04
|
TAKE UPS:
|
22.58
|
Loose laid material per room
|
|
Stuck down including hardboard m2
|
11.81
|
Direct to subfloor m2
|
15.67
|
Electrical appliances, removal and replace - per appliance
|
7.80
|
MINIMUM CHARGES (labour only) PVA:
|
|
Laundry
|
147.07
|
Bathroom
|
147.07
|
Other areas (of total job etc)
|
84.03
|
Ardit Z8
|
84.03
|
Mastick K10
|
84.03
|
ACCESSORIES, TRIM ETC.
|
|
|
Small - 1m
|
3.40
|
|
Large - 1m
|
3.23
|
|
To supply adhesive m2
|
1.09
|
CANCELLATION CHARGE: travel time to & from employers
|
|
premises to site at hourly rate
|
|
SERVICE CHARGE: If layer has to return to site to carry
out
|
|
rectification not own fault - hourly rate plus the service
charge
|
48.16
|
shown
|
|
2. Delete the
amount of "$39.15" appearing in paragraph 4.1(a), of clause 4,
Compensation for Travel Patterns, Mobility Requirements of Contract Floor Layers
and the Nature of Engagement in the Construction Work Covered by this Award,
and insert in lieu thereof the following:
"$41.85"
3. Delete amount
of "$103.79" appearing in subclause 5.1 of clause 5, Living Away from
Home - Distant Work, and insert in lieu thereof the following:
"$105.97"
4. Delete
subclause 7.3 of clause 7, Adjustment of Rates, and insert in lieu thereof the
following:
7.3 The rates of pay
in this award include adjustments payable under the State Wage Case 2008. These
adjustments may be offset against:
any equivalent overaward payments, and/or
award wage increases since May 1991 other than safety
net, State Wage Case and minimum rates adjustments.
5. Delete the
amount of "$46.85" appearing in subclause 10.2 of clause 10, Rectification
Work, and insert in lieu thereof the following:
"$48.72"
6. This variation
shall take effect from the beginning of the first pay period to commence on or
after 23 December 2009.
E.
A. R. BISHOP, Commissioner
____________________