Quarries,
&c. (State) Award
INDUSTRIAL RELATIONS
COMMISSION OF NEW SOUTH WALES
Application by The
Australian Workers' Union, New South Wales, Industrial Organisation of
Employees.
(No. IRC 1935 of 2007)
Before Commissioner
Tabbaa
|
23 October 2007
|
VARIATION
1. Delete clause
3.8, Safety Net Adjustments of the award published 30 June 2000 (316 I.G. 961)
and insert in lieu thereof the following:
3.8. Safety Net
Adjustments
The rates of pay in this award include the adjustments payable
under the State Wage Case 2007. These
adjustments may be offset against:
(a) any equivalent
overaward payments; and/or
(b) award wage
increases since 29 May 1991 other than safety net, State Wage Case, and minimum
rates adjustments.
2. Delete Part 7,
Monetary Rates and insert in lieu thereof the following:
PART 7
MONETARY RATES
Table 1A - Wages
Classification
|
SWC 2006
|
SWC 2007 Adjustment
|
SWC 2007
|
|
$
|
$
|
$
|
Operator Level One
|
578.40
|
20.00
|
598.40
|
Operator Level Two
|
605.30
|
20.00
|
625.30
|
Operator Level Three
|
630.30
|
20.00
|
650.30
|
Operator Level Four
|
653.20
|
20.00
|
673.20
|
Operator Level Five
|
665.70
|
20.00
|
685.70
|
Operator Level Six
|
678.20
|
20.00
|
698.20
|
Operator Level Seven
|
688.20
|
20.00
|
708.20
|
Tradesperson Level One
|
678.20
|
20.00
|
698.20
|
Tradesperson Level Two
|
698.70
|
20.00
|
718.70
|
Tradesperson Level Three
|
701.80
|
20.00
|
721.80
|
Tradesperson Level Four
|
722.30
|
20.00
|
742.30
|
Tradesperson Level Five
|
773.10
|
20.00
|
793.10
|
The rates in Table 1A above include and consume the
"Industry Disability" allowance and the "Inclement Weather"
allowance, (i.e. the rates in Table 1B continue to attract the "Disability
Allowance", Item 26, Table 2). Accordingly, the rates in Table 1A above
compensate employees for working in the open in quarries and thereby being
subject to climatic conditions such as dust blowing in the wind, sloppy and
muddy conditions and the lack of usual amenities associated with factory work
etc., and for the additional disabilities of being required to work when
exposed to inclement weather and for working in isolated and underdeveloped
locations. "Inclement weather" means wet weather and/or abnormal
climatic conditions such as hail, cold, high winds, severe dust storms, extreme
high temperatures or any combination thereof.
Table 1B - Lime
Makers Wages
Classification
|
SWC 2006
|
SWC 2007
|
SWC 2007
|
|
|
Adjustment
|
|
|
$
|
$
|
$
|
Lime Burner attending to more
than three fire holes -
|
|
|
|
cents extra
|
525.70
|
20.00
|
545.70
|
Arch Builder
|
504.40
|
27.00
|
531.40
|
Ash Wheeler
|
504.40
|
27.00
|
531.40
|
Labourer
|
504.40
|
27.00
|
531.40
|
Machine Person
|
511.65
|
20.00
|
531.65
|
Pepper Machinist
|
504.40
|
27.00
|
531.40
|
Powder Monkey
|
511.65
|
20.00
|
531.65
|
Powder Monkey’s assistant
|
504.40
|
27.00
|
531.40
|
Jumper Person
|
504.40
|
27.00
|
531.40
|
Hammer Drill Person
|
504.40
|
27.00
|
531.40
|
Spawler
|
509.00
|
22.40
|
531.40
|
Tool Sharpener
|
504.40
|
27.00
|
531.40
|
Skip person Tip person
|
504.40
|
27.00
|
531.40
|
Truck Driver 5 Tonne Truck
|
504.40
|
27.00
|
531.40
|
Stripper
|
517.65
|
20.00
|
537.65
|
Box Filler in Quarry
|
504.40
|
27.00
|
531.40
|
Operators of navvy, petrol oil
or electric operated:
|
|
|
|
Up to & including .57
cubic metres
|
504.40
|
27.00
|
531.40
|
Over .57 cubic metres and up
to & including 1.5 cubic
|
|
|
|
metres
|
505.50
|
25.90
|
531.40
|
Over 1.5 cubic metres and up
to and including 3
|
515.50
|
20.00
|
535.50
|
cubic metres
|
|
|
|
Over 3 cubic metres and up to
and including 5.3 cubic
|
|
|
|
metres
|
531.80
|
20.00
|
551.80
|
Over 5.3 cubic metres
|
537.25
|
20.00
|
557.25
|
Operator of plant used as rear
and or bottom and or
|
|
|
|
side dumps
|
|
|
|
12 tonnes or more but not
exceeding 15 tonnes
|
508.10
|
23.30
|
531.40
|
15 tonnes or more but not
exceeding 20 tonnes
|
514.00
|
20.00
|
534.00
|
20 tonnes or more
|
515.95
|
20.00
|
535.95
|
Tractor Unit Plant
|
|
|
|
48kw & under
|
504.40
|
27.00
|
531.40
|
Over 48kw
|
514.15
|
20.00
|
534.15
|
Over 97kw to 220kw
|
519.80
|
20.00
|
539.80
|
Tractors whilst using power
operated attachments
|
|
|
|
48kw and under
|
504.40
|
27.00
|
531.40
|
Over 48kw to 97kw
|
515.95
|
20.00
|
535.95
|
Loader front end and overhead:
appropriate tractor
|
|
|
|
rate grader self propelled
over 30kw
|
515.75
|
20.00
|
535.75
|
Grader self propelled under
30kw
|
506.80
|
24.60
|
531.40
|
Air compressor Operator
|
504.40
|
27.00
|
531.40
|
Table 2 - Other
Rates and Allowances
Item
No
|
Clause
No
|
Brief Description
|
SWC 2006
|
SWC 2007
|
|
|
|
$
|
$
|
1
|
3.1(5)(a)
|
In charge of plant
|
13.25 per week
|
13.80 per week
|
|
3.1(5)(b)
|
Leading hand allowances
|
|
|
2
|
|
2 to 5 employees
|
19.70 per week
|
20.50 per week
|
3
|
|
6 to 10 employees
|
27.60 per week
|
28.70 per week
|
4
|
|
11 to 20 employees
|
39.30 per week
|
40.85 per week
|
5
|
|
More than 20 employees
|
49.90 per week
|
51.90 per week
|
6
|
3.1(6)(a)
|
Confined spaces
|
0.59 per hour
|
0.61 per hour
|
7
|
3.1(6)(b)
|
Dirty work
|
0.44 per hour
|
0.46 per hour
|
8
|
3.1(6)(c)
|
Height money
|
0.33 per hour
|
0.34 per hour
|
|
3.1(6)(d)
|
Hot places
|
|
|
9
|
|
Between 46 & 54 degrees Celsius
|
0.43 per hour
|
0.45 per hour
|
10
|
|
Exceeds 54 degrees Celsius
|
0.59 per hour
|
0.61 per hour
|
11
|
3.3(1)
|
Tools
|
12.55 per week
|
13.00 per week
|
12
|
3.4(2)
|
First Aid allowance
|
2.14 per day
|
2.23 per day
|
13
|
3.7(6)(b)
|
Meal allowance
|
11.40 per meal
|
11.90 per meal
|
14
|
3.7(6)(c)
|
Board and lodging
|
354.30 per week
|
362.80 per week
|
15
|
3.7(7)
|
Motor vehicle allowance
|
0.50 per km
|
0.52 per km
|
16
|
3.7(8)
|
Transport not available
|
5.60 per day
|
5.80 per day
|
17
|
4.7(5)(a)
|
Meal allowance
|
11.40 per meal
|
11.90 per meal
|
18
|
4.7(5)(b)
|
Meal allowance
|
11.40 per meal
|
11.90 per meal
|
Lime-making
related allowances
|
19
|
3.5(3)
|
Attending to generator/dynamo
|
17.15
|
17.85
|
20
|
3.5(4)
|
In charge of plant
|
17.15
|
17.85
|
21
|
3.5(5)
|
Leading hands
|
|
|
|
|
Less than 3 employees
|
10.60
|
11.00
|
|
|
3 to 6 employees
|
17.90
|
18.60
|
|
|
More than 6 employees
|
22.50
|
23.40
|
22
|
3.5(2)(iv)
|
Afternoon shift
|
38.30
|
39.85
|
23
|
3.5(1)
|
Disability Allowance
|
35.90
|
37.35
|
"Note": These allowances are contemporary for
expense related allowances as at 30 June 2007 and for work related allowances
are inclusive of adjustment in accordance with the June 2007 State Wage Case Decision
of the Industrial Relations Commission of New South Wales.
3. This
variation shall take effect from the first full pay period to commence on or
after 13 November 2007.
I.
TABBAA, Commissioner
____________________
Printed by
the authority of the Industrial Registrar.